  • Enter the earlier amount in Baseline waste (kg), at zero or above.
  • Set Measurement period (days) to at least 1 day.
  • In Current waste kg, disposal/value cost per kg, enter the two nonnegative numbers separated by a comma, then select Calculate.
  • Use consistent cost units for the kilograms being measured; the yearly projection assumes 365 days.

Reading the result

  • Waste reduction is baseline minus current waste, so a negative amount means waste increased; Reduction rate uses the baseline as its denominator when it is positive.
  • Projected annual value scales positive reductions by entered cost and 365 days. It is set to zero when waste rises and does not promise actual savings.

Examples

Three kilograms less waste over seven days

Input
Enter Baseline waste (kg)โ‰ฅ 0: 8. Enter Measurement period (days)โ‰ฅ 1: 7. Enter Current waste kg, disposal/value cost per kg: 5,2. Select Calculate.
Result
Waste reduction: 3.00 kg Reduction rate: 37.5% Projected annual value: 312.86
How to check it
8 โˆ’ 5 = 3.00 kg, and 3 รท 8 ร— 100 = 37.5%. Annual value = 3 ร— 2 ร— 365 รท 7 = 312.86 after rounding.

Two kilograms more waste over ten days

Input
Enter Baseline waste (kg)โ‰ฅ 0: 5. Enter Measurement period (days)โ‰ฅ 1: 10. Enter Current waste kg, disposal/value cost per kg: 7,3. Select Calculate.
Result
Waste reduction: -2.00 kg Reduction rate: -40.0% Projected annual value: 0.00
How to check it
5 โˆ’ 7 = โˆ’2.00 kg, and โˆ’2 รท 5 ร— 100 = โˆ’40.0%. Because reduction is negative, the annual value is 0.00.

Frequently asked questions

Why is my reduction negative?
Your current waste amount is higher than the baseline.
Why can annual value be zero?
The calculator does not assign a positive projected value when there is no reduction.
Is this an actual annual saving?
No. It extends one measured period over 365 days at your entered cost per kilogram.